Construction cost calculator
What it costs to build, phase by phase, before a contractor quotes.
The plot
1 marla = 272.25 sq ft, 30.25 sq yd
Plot area works out at 2,723 sq ft.
What you are building
Build quality
What most family homes are built to. Branded fittings, tiled floors.
Covers structure labour, supervision and the contractor margin.
This is where quality shows up. Change it and everything below moves.
At Rs 7,398 per square foot, with the contingency and price escalation already inside this number.
- Covered4,492 sq ft
- Floors2
- Build time11 months
- Grey structureRs 1.41 crore42.5%
- FinishingRs 1.44 crore43.3%
- Fees and permitsRs 14.47 lakh4.4%
- ContingencyRs 32.91 lakh9.9%
- Cost per square footRs 7,398Rs 3,144 structure, Rs 3,200 finishing
- Cost per marla builtRs 20.14 lakhCovered area, not plot area
- Contingency and escalationRs 3,291,3028% reserve plus price movement
- Fees and approvalsRs 1,447,056Design, permits and supervision
Material take-off
| Material | Quantity | Rate | Amount |
|---|---|---|---|
| Cement | 1,796.9 bags | Rs 1,400 | Rs 2,515,590 |
| Steel bar | 17,070 kg | Rs 275 | Rs 4,694,271 |
| Bricks | 58,398 pieces | Rs 21 | Rs 1,226,350 |
| Sand | 7,187.4 cft | Rs 55 | Rs 395,307 |
| Crush and aggregate | 5,615.2 cft | Rs 110 | Rs 617,667 |
| Electrical rough-in | 4,492.1 sqft | Rs 95 | Rs 426,752 |
| Plumbing rough-in | 4,492.1 sqft | Rs 110 | Rs 494,134 |
| Waterproofing and termite treatment | 4,492.1 sqft | Rs 55 | Rs 247,067 |
Quantities are a planning estimate. A structural drawing changes the steel more than anything else on this list, so treat these as a check against a supplier quote rather than an order sheet.
Finishing
Fees and approvals
What you pay, month by month
- Money spent to date
Peak spend lands in the middle of the build when the structure and the finishing overlap. Line your money up against this curve rather than dividing the total by the number of months.
Phase by phase
| Phase | Weeks | Cost | Paid so far |
|---|---|---|---|
| Site clearing and excavation | 1 to 2 | Rs 988,144 | Rs 988,144 |
| Foundation and damp proof course | 3 to 6 | Rs 2,305,670 | Rs 3,293,814 |
| Ground floor structure | 7 to 14 | Rs 3,952,577 | Rs 7,246,392 |
| Upper floor structure | 15 to 21 | Rs 3,293,814 | Rs 10,540,206 |
| Roof slab and curing | 22 to 24 | Rs 1,976,289 | Rs 12,516,495 |
| Brickwork and blockwork | 25 to 28 | Rs 1,976,289 | Rs 14,492,783 |
| Electrical and plumbing rough-in | 29 to 31 | Rs 1,317,526 | Rs 15,810,309 |
| Plaster and screed | 32 to 34 | Rs 1,664,668 | Rs 17,474,977 |
| Flooring and tiling | 35 to 38 | Rs 3,688,318 | Rs 21,163,295 |
| Doors, windows and joinery | 39 to 42 | Rs 4,023,619 | Rs 25,186,914 |
| Kitchen and bathrooms | 43 to 45 | Rs 3,688,318 | Rs 28,875,232 |
| Paint, fittings and handover | 46 to 49 | Rs 4,358,921 | Rs 33,234,153 |
Where the money goes
- Grey structureRs 14,120,995
- FinishingRs 14,374,800
- FeesRs 1,447,056
- ContingencyRs 2,395,428
- EscalationRs 895,874
How to keep it on budget
- Buy steel and cement in bulk at the start of a phase. Both move with the market and a week of delay can cost more than the discount.
- Freeze the drawings before excavation. Changes made after the slab is poured are the single biggest source of overruns.
- Keep grey structure and finishing on separate contracts. Mixing them hides where the money actually goes.
- Ask for rates in writing per item, not one lump sum. A lump sum quote cannot be checked against a bill of quantities.
- Order tiles, sanitary and joinery early. Lead times on anything imported will stall the finishing phase.
- Hold back five to ten percent of every payment until the phase is signed off. Retention is normal and it keeps quality honest.
About this calculator
Price a build from plot size and covered area, split the structure from the finishing, and get a month by month payment schedule with a contingency you can defend. Material take-off in bags, kilos and bricks at rates you can edit, plus map approval and supervision fees. Shell and fit out rates per square foot with architect, planning, building regulations and warranty costs.
Material and labour rates move constantly. Every rate here is editable, so put in what your supplier quoted this week.